Work is continuing on the Tipperary Hills Enhancement project
The Kickabout area is being levelled and reseeded


A viewing point at Mutton Pie has been enhanced.


Paths to the Mast area have been installed


And a looped path has been installed on the top of the Cup and Saucer.








Works are expected to be completed by December including all planting.