Delays Expected As Road Resurfacing Work Begin On O Brien Street

437

Drivers in the Tipperary Town area are being advised to expect delays on O Brien Street as the road resurfacing works are being carried out.

The works at the junction of O’Connell road and the Emly and Galbally roads start today and are expected to be finished on Monday evening.  

Temporary Traffic Management will be operating and local diversions will be in place for the duration of the works.

The resurfacing works will conclude a remodelling of the junction and result in it now operating as staggered junction instead of the former roundabout. T

The new layout was designed to address resident concerns about speeding at the junction.